BUILDING & ZONING INSPECTIONS
INSPECTION NOTICE: Beginning January 1, 2012, the Codes Department will be setting days and hours for Building Inspections only. There will be no change to Zoning Inspections (i.e. footers, sheds, retaining walls under 4', etc.)
Codes Department
Hours:
Monday - Friday 7:00
am - 3:30 pm
Zoning Inspections:
Monday - Friday 7:30 am - 2:30 pm
Building Inspections:
November through
February:
Monday & Wednesday 7:30 am - 10:30 am
Tuesday & Thursday 12:00 pm - 3:00 pm
March, April, September & October: Monday,
Wednesday & Friday 7:30 am - 2:30 pm
May through August:
Monday, Wednesday & Friday 7:30 am - 2:30 pm
Tuesday 7:30 am - 10:30 am
Thursday 12:00 pm - 3:00 pm
REQUIRED INSPECTIONS DURING CONSTRUCTION STAGES
This is a complete
list of inspections required by West Bradford Township. Some may not apply due to the scope of the work being
performed.
Construction work must be inspected in accordance with the following instructions. The Municipal Code Enforcement Department will perform periodic inspections, as required and identified below, during the progress of work to insure that the work conforms to the approved construction plans and applicable codes and ordinances. The property owner and/or an authorized agent who is in charge of the construction work shall notify the Code Enforcement Department when each segment of work is completed and ready for inspection. The inspections referenced below shall be scheduled at least twenty-four (24) hours in advance and will be handled on a first come, first served basis. It is strongly recommended that persons responsible for construction activities schedule inspections at least a few days in advance in order to minimize disruption of construction work. Please note that no work is permitted to proceed beyond the applicable phase of construction until the applicable inspection is conducted and approved by the Municipal Code Enforcement Department.
Footings To be performed (prior to the placement of concrete) when subsoil excavation is complete, all forms and reinforcement are in place, and depth markings defined. All footings must be trenched or formed.
Foundation Wall To be performed (prior to the placement of concrete) when all concrete forms and all reinforcements are in place and footing key and/or dowels are visible.
Steel Inspection To be performed (prior to the placement of concrete) when all in-ground pool steel reinforcement work is complete and an electric bonding inspection sticker from a qualified electrical underwriting agency is in place.
Backfill To be performed when the exterior foundation drains (with clean stone cover and filter cover) are in place, and all foundation anchor straps/bolts are installed.
Under-Slab Rough Plumbing/Mechanical To be performed (prior to the placement of concrete) when all DWV, water supply piping and HVAC piping is installed, and all appropriate line tests and piping protection are in place.
Concrete Slabs Base To be performed (prior to the placement of concrete) when the clean stone base, insulation boards, 6 mil vapor barrier, reinforcement and depth markings are in place.
Wall and Board Sheathing To be performed when all structural wall and floor sheathing, insulation sheathing and wind bracing is in place and all fastenings are applied in accordance with appropriate fastening schedules.
Firewalls To be performed when firewall components, (i.e. clips, anchors, screws, fire blocking, fire stopping, fire caulking, etc.) are installed in accordance with manufactures specifications.
Rough Plumbing To be performed when all potable and DWV lines are in place, properly protected and anchored and line tests applied.
Rough Electric A rough electric inspection sticker from a qualified electrical underwriting agency shall be in place at time of the framing inspection.
Rough Mechanical To be performed when all ductwork is installed and secured.
Framing To be performed when all framing is complete and secured in accordance with the appropriate fastening schedule and ALL floors are accessible by way of code approved stairs.
Rough Sprinkler To be performed when all piping is installed and a line test is in place.
Insulation To be performed when all insulation batts, vapor barriers and baffles are in place.
Fire Code Drywall To be performed an ALL fire rated assemblies. Where multiple layers of drywall are installed, each successive layer shall be inspected.
Water/Sewer Service To be performed when the stone bed, piping and line tests are in place and foundation walls have been mortared and waterproofing is applied.
Masonry Fireplaces Four (4) inspections required: Footing, Hearth, Smoke Chamber and Final.
Final Sprinkler To be performed prior to final occupancy and includes a flow test and any other test/inspections as required by the building inspector or fire marshal.
Final Electric A final electric inspection sticker from a qualified electrical underwriting agency shall be in place at time of the final occupancy inspection.
Final Occupancy To be performed when all construction activity is complete and prior to any type of occupancy and/or use of the structure being established.
Other Any other inspections the Municipal Code Department may deem appropriate for the work being performed.